powered help
header-left header-center header-right
File #: 181383    Version:
Type: Resolution Status: Passed
File created: 12/18/2018 In control: COMMON COUNCIL
On agenda: Final action: 1/14/2019
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $783,000 for a total estimated cost of these projects being $22,985,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Number
181383
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $783,000 for a total estimated cost of these projects being $22,985,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $783,000 with the total cost estimated to be $22,985,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

2nd Aldermanic District

Sanitary Sewer Lateral Lining in Area Bounded By -- W. Glendale Ave. to W. Congress St. from N. 71st St. to N. 66th St. (SM494180048). Sanitary Sewer lining. (Infiltration/Inflow Reduction Fund -- $20,000). The total estimated cost of this project including the requested amount is $2,159,000. This project is anticipated to be completed during the 2020 construction season.

5th Aldermanic District

W. Burleigh St. (south-side) - N. Menomonee River Pkwy (east) to N. Menomonee River Pkwy (west) (ST210140106) Install asphalt mixed use recreational trail. (non-Assessable New Paving Fund - $5,000). The total estimated cost of the project including the requested amount is $30,000. This project is anticipated to be completed during the 2019 construction season.

7th Aldermanic District

Sanitary Sewer Lateral Lining in Area Bounded By - W. Capitol Dr. to W. Concordia Ave. from N. Sherman Blvd. to N. 38th St. (SM494180049) Sanitary Sewer lining. (Infiltration/Inflow Reduction Fund -- $20,000). The total estimated cost of this project including ...

Click here for full text