powered help
header-left header-center header-right
File #: 180517    Version:
Type: Resolution Status: Passed
File created: 7/10/2018 In control: COMMON COUNCIL
On agenda: Final action: 7/31/2018
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $49,000 for a total estimated cost of these projects being $1,122,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Number
180517
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $49,000 for a total estimated cost of these projects being $1,122,000.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction. The City cost for engineering these projects is estimated to be $49,000 with the total cost estimated to be $1,122,000.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

2nd Aldermanic District

Alley between W. Capitol Dr., W. Melvina St., N. 63rd St. and N. 64th St. (ST212180112). Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary.
(Non assessable Alley Paving Fund -- $12,000). The total estimated cost for this project including the requested amount is $95,000. This project is anticipated to be completed during the 2020-21 construction season.

6th Aldermanic District

N. 2nd St.- W. North Ave. to W. Center St. (SM499180117).Installing bioswales.
(Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $10,000). The total estimated cost f...

Click here for full text