Title:
|
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $4,691,980 for a total estimated cost of $4,926,300.
|
Indexes:
|
PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
|
4/13/2018 | 1 |
CITY CLERK
| PUBLISHED | | |
Action details
|
Meeting details
|
Not available
|
4/4/2018 | 1 |
MAYOR
| SIGNED | | |
Action details
|
Meeting details
|
Not available
|
3/27/2018 | 1 |
COMMON COUNCIL
| ADOPTED | Pass | 15:0 |
Action details
|
Meeting details
|
Video
|
3/7/2018 | 0 |
PUBLIC WORKS COMMITTEE
| RECOMMENDED FOR ADOPTION
Minutes note: Mary Dziewiontkoski - DPW
1st Aldermanic District
Alley between W. Fairmont Ave., W. Villard Ave., N. 51st Blvd., and N. 53rd St. (North - South Leg) (ST212140103)
Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary.
Ald. Borkowski moved approval. (Prevailed 4-0)
N. Teutonia Ave. - W. Good Hope Rd. to W. Bradley Rd. (Portions in the Village of Brown Deer) (ST211180121)
Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6’ width of tree border area), and grading.
Ald. Kovac moved approval. (Prevailed 4-0)
W. Oriole Dr. -- N. 27th St. to N. Teutonia Ave. (ST211170151)
Install traffic calming speed hump(s).
Ald. Donovan moved approval. (Prevailed 4-0)
N. 24th Pl. -- W. Hope Ave. to W. Atkinson Ave. (ST211170154)
Install traffic calming speed hump(s).
Walter Bankhead Jr 4227 N 24th Pl stated he does not want the speed hump in front of his house because of his driveway, and there should be two in the 4100 block.
Ald. Kovac moved approval. (Prevailed 4-0)
3rd Aldermanic District
Alley between N. Humboldt Ave., E. Meineke Ave., N. Weil St. and E. Wright St. (ST212160105)
Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary.
Ald. Kovac moved approval. (Prevailed 4-0)
4th Aldermanic District
N. 34th St. -- W. St. Paul Ave. to W. Clybourn St. (ST211180162)
Install traffic calming speed hump(s).
Sherrie Tussler 3402 W St Paul Ave stated she is in support.
Ald. Donovan moved approval. (Prevailed 4-0)
5th Aldermanic District
Alley between W. Burleigh St., W. Chambers St., N. 90th St., and N. 91st St. (ST212020130)
Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary.
Ald. Bohl stated he is in support.
Ald. Borkowski moved approval. (Prevailed 4-0)
Alley between W. Concordia Ave., W. Townsend St., N. 91st St., and N. 92nd St. (South Half) (ST212050120)
Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary.
Ald. Bohl stated neighbors present were in support.
Ald. Donovan moved approval. (Prevailed 4-0)
8th Aldermanic District
Alley between W. Arthur Ave., W. Hayes Ave., S. 33rd St., and S. 34th St. (ST21210127)
Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary.
Ald. Donovan moved to hold the project. (Prevailed 4-0)
S. 29th St - W. Hayes Ave. to W. Lincoln Ave. (ST211180167)
Install traffic calming speed hump(s).
Ald. Donovan moved approval. (Prevailed 4-0)
9th Aldermanic District
N. Joseph Ave. - W. Tower Ave. to N. Pingree Ave. (ST211180173)
Install traffic calming speed hump(s).
Bill Pietsch 8159 N Joseph Ave stated he is opposed and provided a petition from residents. Ald. Kovac moved to enter the petition into the record. (Prevailed 4-0)
Ald. Kovac moved to delete the project. (Prevailed 4-0)
11th Aldermanic District
Alley between W. Morgan Ave., W. Warnimont Ave., S. 83rd St., and S. 84th St.
(ST212160111)
Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary.
Ald. Borkowski moved approval. (Prevailed 4-0)
12th Aldermanic District
Alley between W. Cleveland Ave., S. 15th Pl., S. 16th St., and the Kinnickinnic River (ST212180107)
Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary.
Ald. Kovac moved approval. (Prevailed 4-0)
Alley between W. Hayes Ave., W. Lincoln Ave., S. 7th St., and S. 8th St. (ST212160109)
Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary.
Ald. Donovan moved approval. (Prevailed 4-0)
13th Aldermanic District
Alley between W. Crawford Ave., W. Wilbur Ave., S. 14th St., and S. 15th St. (ST212070108)
Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary.
Ald. Kovac moved approval. (Prevailed 4-0)
S. Quincy Ave. -- E. Layton Ave. to E. Bolivar Ave. (ST211180166)
Install traffic calming speed hump(s).
Ald. Borkowski moved to delete. (Prevailed 4-0)
Ald. Donovan moved approval as amended. (Prevailed 5-0) | Pass | 5:0 |
Action details
|
Meeting details
|
Video
|
2/27/2018 | 0 |
COMMON COUNCIL
| ASSIGNED TO | | |
Action details
|
Meeting details
|
Not available
|
|
Number 171708 Version SUBSTITUTE 1 Reference 120112 Sponsor THE CHAIR Title Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $4,691,980 for a total estimated cost of $4,926,300. Analysis This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $4,691,980. The total estimated cost of these projects is $4,926,300. Body Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements: 1st Aldermanic District Alley between W. Fairmount Ave., W. Villard Ave., N. 51st Blvd., and N. 53rd St. (North - South Leg) (ST212140103) File Number 120112: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary. (Assessable Alley Paving Fund -- $35,000; Nonassessable Alley Paving Fund -- $140,000). The total estimated cost for this project including the requested amount is $275,000. This project is anticipated to be completed during the 2018 construction season. N. Teutonia Ave. - W. Good Hope Rd. to W. Bradley Rd. (Portions in the Village of Brown Deer) (ST320-XX-XXXX) File Number 171656: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6’ width of tree border area), and grading. (Milwaukee County is lead agency)... Click here for full text
|