File #: 170277    Version:
Type: Resolution Status: Passed
File created: 5/31/2017 In control: COMMON COUNCIL
On agenda: Final action: 6/20/2017
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $103,200 for a total estimated cost of $104,800.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Transmittal letter, 2. Official Notice, 3. Notice Published 7-7-17
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
6/28/20171 MAYOR SIGNED   Action details Meeting details Not available
6/20/20171 COMMON COUNCIL ADOPTEDPass13:0 Action details Meeting details Video Video
6/7/20170 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW Joseph Blakeman - DPW 1st Aldermanic District W. Bobolink Ave. – A point east of N. 29th St. to N. Teutonia Ave. (ST211170162): Install traffic calming speed hump(s). Mitchell Spectra 2838 W Bobolink is in opposition and the street need to be repaired. Junior Atkins 2937 W Bobolink is in support and there are speeders on a regular. Samuel Coleman, 1st District Staff Assistant, stated that Ald. Hamilton received majority in favor of the project. Ald. Bauman moved approval. (Prevailed 5-0) N. 16th St. – W. Capitol Dr. to W. Fiebrantz Ave. (ST211170134): Install traffic calming speed hump(s). Samuel Coleman, 1st District Staff Assistant, stated that Ald. Hamilton would like to delete the project. Ald. Donovan moved to approval to delete the project. (Prevailed 5-0) N. 25th St. – W. Hope Ave. to W. Roosevelt Dr. (ST211170155): Install traffic calming speed hump(s). Samuel Coleman, 1st District Staff Assistant, stated that Ald. Hamilton is in support. Ald. Kovac moved approval. (Prevailed 5-0) 2nd Aldermanic District N. 83rd St. – W. Villard Ave. to W. Sheridan Ave. (ST211160134): Install traffic calming speed hump(s). Ald. Donovan moved approval. (Prevailed 5-0) 2nd and 10th Aldermanic Districts W. Melvina St. – N. 60th St. to N. 63rd St. (ST211170166): Install traffic calming speed hump(s). Ald. Bauman moved approval. (Prevailed 5-0) W. Melvina St. – N. 65th St. to N. 66th St. (ST211170190): Install traffic calming speed hump(s). Ald. Bohl moved approval. (Prevailed 5-0) 7th Aldermanic District W. Leon Terr. – W. Ridge Ct. to W. Hoyt Pl. (ST211170165): Install traffic calming speed hump(s). Don Reynolds 4604 W Leon Terrace stated that he is in opposition. Bob Coplan 4540 W Leon Terrace stated that he is in opposition and stop signs on both ends of the street would be better. Ald. Donovan moved to delete the project based on neighborhood testimony. (Prevailed 5-0) N. 40th St. – W. Nash St. to W. Roosevelt Dr. (ST211170147): Install traffic calming speed hump(s). Dora Peavy 3709 N 40th St. stated that she is in opposition and would rather money be used toward street repairs and lead pipes replacement. Pat Echols 3830 N 40th St. stated that she is in opposition. Mary Dziewiontkoski stated that Ald. Rainey received 6 yes 4 noes and is in support. Ald. Donovan moved to Hold to the Call of the Chair for Ald. Rainey to meet with neighbors. (Prevailed 5-0) N. 42nd St. – W. Marion St. to W. Congress St. (ST211170196): Install traffic calming speed hump(s). Ald. Bohl moved to Hold to the Call of the Chair for Ald. Rainey to meet with neighbors. (Prevailed 5-0) N. 47th St. – W. Concordia Ave. to W. Townsend St. (ST211170181): Install traffic calming speed hump(s). Faye King 3326 N 47th St stated that she is in opposition and rarely sees speeders. Linda Collins 3310 N 47th St stated that she is in support and has witnessed speeding Dorothy Tony 3331 N 47th St stated that she is in support and has witnessed speeding. Ald. Bohl moved to Hold to the Call of the Chair for Ald. Rainey to meet with neighbors. (Prevailed 4-0) Ald. Bauman moved reconsideration. (Prevailed 4-0) Mary Dziewiontkoski stated that survey results show 3 yes, 1 no and Ald. Rainey is in support of the majority. Ald. Bauman moved approval. (Prevailed 4-0) 15th Aldermanic District N. 16th St. – W. Lloyd St. to W. North Ave. (ST211170177): Install traffic calming speed hump(s). Mary Dziewiontkoski stated that Ald. Stamper is in support. Ald. Kovac moved approval. (Prevailed 4-0) N. 19th St. – W. Wright St. to W. Clarke St. (ST211110160): Install traffic calming speed hump(s). Richard Quarles 2564 N 19th St stated that he is in support and has witnessed speeding. Ald. Donovan moved approval. (Prevailed 5-0) N. 25th St. – W. Lisbon Ave. to W. Brown St. (ST211170146): Install traffic calming speed hump(s). Ald. Bauman moved approval. (Prevailed 5-0) Ald. Bauman moved approval as amended. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
5/31/20170 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

170277

Version

SUBSTITUTE 1

Reference

170276

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $103,200 for a total estimated cost of $104,800.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $103,200.  The total estimated cost of these projects is $104,800.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

1st Aldermanic District

 

W. Bobolink Ave. - A point east of N. 29th St. to N. Teutonia Ave. (ST211170162):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $14,700; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $16,700.  This project is anticipated to be completed during the 2017 construction season.

 

N. 25th St. - W. Hope Ave. to W. Roosevelt Dr. (ST211170155):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $9,500; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $11,500.  This project is anticipated to be completed during the 2017 construction season.

 

2nd Aldermanic District

 

N. 83rd St. - W. Villard Ave. to W. Sheridan Ave. (ST211160134):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $8,200; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $10,200.  This project is anticipated to be completed during the 2017 construction season.

 

2nd and 10th Aldermanic Districts

 

W. Melvina St. - N. 60th St. to N. 63rd St. (ST211170166) File Number 170276:  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $3,400; Nonassessable Reconstruction Paving Fund -- $13,000).  The total estimated cost for this project including the requested amount is $18,000.  This project is anticipated to be completed during the 2017 construction season.

 

W. Melvina St. - N. 65th St. to N. 66th St. (ST211170190):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $3,200; Nonassessable Reconstruction Paving Fund -- $3,000).  The total estimated cost for this project including the requested amount is $6,200.  This project is anticipated to be completed during the 2017 construction season.

 

7th Aldermanic District

 

N. 47th St. - W. Concordia Ave. to W. Townsend St. (ST211170181):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $8,300; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $10,300.  This project is anticipated to be completed during the 2017 construction season.

 

15th Aldermanic District

 

N. 16th St. - W. Lloyd St. to W. North Ave. (ST211170177):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $10,000; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $12,000.  This project is anticipated to be completed during the 2017 construction season.

 

N. 19th St. - W. Wright St. to W. Clarke St. (ST211110160):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $5,900; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $7,900.  This project is anticipated to be completed during the 2017 construction season.

 

N. 25th St. - W. Lisbon Ave. to W. Brown St. (ST211170146):  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $9,000; Nonassessable Reconstruction Paving Fund -- $3,000).  The total estimated cost for this project including the requested amount is $12,000.  This project is anticipated to be completed during the 2017 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That projects:  W. Bobolink Ave. (ST211170162), N. 25th St. (ST211170155), N. 83rd St. (ST211160134), W. Melvina St. (ST211170166), W. Melvina St. (ST211170190), N. 47th St. (ST211170181), N. 16th St. (ST211170177), N. 19th St. (ST211110160), and N. 25th St. (ST211170146) will be billed after January 1, 2019, but not before 12 months after the project contract has been completed; and, be it

 

Further Resolved, That the following projects be deleted from the 2017 Paving Program:  N. 16th St. (ST211170134) and W. Leon Terr. (ST211170165).

 

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/Denise Reinholtz

Afr 13

06/08/2017