File #: 150996    Version:
Type: Resolution Status: Passed
File created: 11/2/2015 In control: COMMON COUNCIL
On agenda: Final action: 11/24/2015
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $462,000 for a total estimated cost of $523,500.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. Transmittal Letter, 2. Official Notice, 3. Notice Published on 12-14-15
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
12/14/20151 CITY CLERK PUBLISHED   Action details Meeting details Not available
12/2/20151 MAYOR SIGNED   Action details Meeting details Not available
11/24/20151 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
11/11/20150 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - Department of Public Works 5th Aldermanic District W. Fairmount Ave. – N. 107th St. to N. 108th St. (ST211150159): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7-foot width of tree border area), and grading. Ald. Bohl moved approval. (Prevailed 3-0) 9th Aldermanic District W. Douglas Ave. – N. 55th St. – N. 60th St. (ST211150172): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6-foot width of tree border area), and grading. Robert Quinn 5777 W Douglas Ave stated his curb and gutter are fine and does not need replacement. Ald. Bohl moved approval. (Prevailed 3-0) N. 55th St. – W. Florist Ave. to a point north of W. Douglas Ave. (ST211150171): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (17-foot width of tree border area (west side)), and grading. Ald. Bohl moved approval. (Prevailed 3-0)
Pass4:0 Action details Meeting details Video Video
11/2/20150 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
150996
Version
SUBSTITUTE 1
Reference
140146
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $462,000 for a total estimated cost of $523,500.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $462,000. The total estimated cost of these projects is $523,500.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

5th Aldermanic District

W. Fairmount Ave. - N. 107th St. to N. 108th St. (ST211150159) File Number 140146: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7-foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $2,600; Nonassessable Reconstruction Paving Fund -- $75,000). The total estimated cost for this project including the requested amount is $100,000. This project is anticipated to be completed during the 2016 construction season.

8th Aldermanic District

S. 29th St. - W. Becher St. to W. Rogers St. (ST211150213) File Number 150995: Install traffic calming speed hump(s). The total estimated cost for this project is $6,500. This project is anticipated to be completed during the 2015 construction season.

9th Aldermanic District

W. Douglas Ave. - N. 55th St. to N. 60th St. (ST211150172) File ...