File #: 080388    Version:
Type: Resolution Status: Passed
File created: 7/1/2008 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 7/30/2008
Effective date:    
Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $3,152,000 for a total estimated cost of these projects being $7,305,400.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Infrastructure Services Division Cover Letter, 2. Hearing notice list, 3. Fiscal note, 4. Comptroller Certification for N. Teutonia Ave...
Number
080388
Version
SUBSTITUTE 1
Reference
080124
Sponsor
THE CHAIR
Title
Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $3,152,000 for a total estimated cost of these projects being $7,305,400.
Analysis
This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works. The City cost of the projects approved by this resolution is estimated to be $3,152,000. The total estimated cost of these projects is $7,305,400.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and

Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:

1st Aldermanic District

N. Teutonia Ave. over W. Silver Spring Dr. (Bridge and Approaches ST32002310/BR32000310) (2080-07-70) File Number 080124: Concrete deck and approach replacement. (Grantor Reimbursable Paving Fund -- $30,000 Additional Funds; Grantor Reimbursable Structure Fund -- $25,000 Additional Funds; City Share Non-Assessable Structure Fund -- $50,000 Additional Funds).

These funds are to be transferred to the construction account (ST32000310)
(2080-07-70).

Previously authorized for road construction: $1,050,000.00.

Current estimated cost of the total project including this resolution: $1,446,400.00.

Original estimated cost of the total project: $439,000.00.

This project is anticipated to be completed during the 2008 construction season.

3rd Aldermanic District

E. Boylston St. - N. Warren Ave. to N. Cambride Ave. (SM495070098) File Number 080387: Relay combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $53,000). The total estimated cost for this project includi...