File #: 061545    Version:
Type: Resolution Status: Passed
File created: 3/22/2007 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 4/17/2007
Effective date:    
Title: Substitute resolution authorizing the City Engineer to apply for nine (9) Congestion Mitigation and Air Quality grants.
Sponsors: THE CHAIR
Indexes: AIR QUALITY, BRIDGES, ENVIRONMENT, STATE GRANTS, WISCONSIN DEPARTMENT OF TRANSPORTATION
Attachments: 1. Fiscal Note.pdf, 2. Infrastructure Services Division Cover Letter.pdf, 3. Applications, 4. Application 3/30/07
Number
061545
Version
SUBSTITUTE 1
Reference

Sponsor
THE CHAIR
Title
Substitute resolution authorizing the City Engineer to apply for nine (9) Congestion Mitigation and Air Quality grants.
Analysis
The Wisconsin Department of Transportation is soliciting applications for funds under the Congestion Mitigation and Air Quality Program. Successful grant applications will be funded 80 percent by the grant program. The Department of Public Works intends to submit nine applications.
Body
Whereas, The Wisconsin Department of Transportation is soliciting applications for funds under the Congestion Mitigation and Air Quality Program; and

Whereas, The program is intended to improve air quality by encouraging alternatives to single occupancy motor vehicles and by making traffic flow more efficiently by optimizing traffic signals; and

Whereas, DPW intends to submit applications for the following projects:

1. Short Term Bike Rental Program

2. Bicycle Lane Installations

3. Open Metal Grate Bridge Improvements

4. Pedestrian Countdown Timers at 325 Signalized Intersections

5. Computer Optimization of 74 Traffic Signals on E/W Capitol Drive and West Fond du Lac Avenue

6. Computer Optimization of 34 Traffic Signals in the Bay View Area

7. Installation of Coordinated Traffic Signals at Six (6) All-Way Stop Controlled Locations

8. Replacement of Master Clocks to Synchronize the City's 735 Traffic Signals

9. Expansion of Traffic Adaptive Signal System

; now, therefore be it

Resolved, By the Common Council of the City of Milwaukee, that the City Engineer is authorized to submit applications for the Congestion Mitigation and Air Quality Program for the following projects:

1. Short Term Bike Rental Program, estimated cost $940,000

2. Bicycle Lane Installations, estimated cost $600,000

3. Open Metal Grate Bridge Improvements, estimated cost $700,000

4. Pedestrian Countdown Timers at 325 Signalized Intersections, estimated cost $2,250,000

5. Computer Optim...