Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,045,700 for a total estimated cost of $1,105,000.
Sponsors: THE CHAIR
Indexes: ASSESSMENTS, PUBLIC IMPROVEMENTS
Attachments: 1. Signed letter.pdf, 2. signed ad.pdf
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
6/25/20201 MAYOR SIGNED   Action details Meeting details Not available
6/16/20201 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
6/3/20201 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 1st Aldermanic District N. 44th St. – W. Villard Ave. to W. Custer Ave. (ST211160102) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding ( 7’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 5-0) 11th Aldermanic District W. Warnimont Ave. – W. Eden Pl. to S. Massachusetts Ave. (ST211120117) Asphalt pavement resurfacing. Ald. Borkowski moved approval. (Prevailed 5-0) 15th Aldermanic District N. 23rd St. – W. Center St. to W. Locust St. (ST211190137) Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (8.5’ width of tree border area), and grading. Ald. Stamper moved approval. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
5/27/20200 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

200123

Version

SUBSTITUTE 1

Reference

141248

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,045,700 for a total estimated cost of $1,105,000.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $1,045,700.  The total estimated cost of these projects is $1,105,000.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

1st Aldermanic District

 

N. 44th St. - W. Villard Ave. to W. Custer Ave. (ST211160102)  File Number 141248:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding ( 7’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $27,300; Nonassessable Reconstruction Paving Fund  -- $275,000).   The total estimated cost of this project including the requested amount is $330,000.  This project is anticipated to be completed during the 2020 construction season.

 

11th Aldermanic District

 

W. Warnimont Ave. - W. Eden Pl. to S. Massachusetts Ave. (ST211120117) Asphalt pavement resurfacing.  File Number 091621: Nonassessable Reconstruction Paving Fund  -- $60,000).   The total estimated cost of this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2020 construction season.

 

15th Aldermanic District

 

N. 23rd St. - W. Center St. to W. Locust St. (ST211190137)  File Number 190148: Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (8.5’ width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $33,400; Nonassessable Reconstruction Paving Fund  -- $650,000).   The total estimated cost of this project including the requested amount is $700,000.  This project is anticipated to be completed during the 2020 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

 

Further Resolved, That projects  N. 44th St. (ST211160102);  W. Warnimont Ave. - (ST211120117); N. 23rd St. (ST211190137) will be billed after January 1, 2022, but not before 12 months after the project contract has been completed; and, be it

 

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/dl

Afr 12