<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>City of Milwaukee - Meeting of PUBLIC WORKS COMMITTEE on 6/7/2023 at 9:00 AM</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=CalendarDetail&amp;From=RSS&amp;ID=1010808&amp;GUID=CED8DA77-5E45-49B6-8EDA-59DAE376C6C3</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://milwaukee.legistar.com/Feed.ashx?GUID=CED8DA77-5E45-49B6-8EDA-59DAE376C6C3&amp;ID=1010808&amp;M=CalendarDetail&amp;Title=City+of+Milwaukee+-+Meeting+of+PUBLIC+WORKS+COMMITTEE+on+6%2F7%2F2023+at+9%3A00+AM" rel="self" type="application/atom+xml" /><item><title>230184</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6266021&amp;GUID=40CEB3DB-CA52-4B7C-B85C-AD942197BECC</link><guid isPermaLink="false">40CEB3DB-CA52-4B7C-B85C-AD942197BECC-2024-06-28-18-59-52</guid><description>File #: 230184&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: 1.&lt;br /&gt;Type: Resolution&lt;br /&gt;Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $991,000 for a total estimated cost of $1,040,000.&lt;br /&gt;Action: RECOMMENDED FOR  ADOPTION&lt;br /&gt;Result: Pass</description><category>Resolution</category><pubDate>Fri, 28 Jun 2024 18:59:52 GMT</pubDate></item><item><title>230185</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6266022&amp;GUID=705E2419-204E-4F98-A437-49CE0F22A9B1</link><guid isPermaLink="false">705E2419-204E-4F98-A437-49CE0F22A9B1-2024-06-28-18-59-52</guid><description>File #: 230185&lt;br /&gt;Ver.: 0&lt;br /&gt;Agenda #: 2.&lt;br /&gt;Type: Resolution&lt;br /&gt;Title: Resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $30,000 for a total estimated cost of these projects being $970,000.&lt;br /&gt;Action: RECOMMENDED FOR  ADOPTION&lt;br /&gt;Result: Pass</description><category>Resolution</category><pubDate>Fri, 28 Jun 2024 18:59:52 GMT</pubDate></item><item><title>230186</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6266023&amp;GUID=7A302FE9-A760-4813-A28E-2248BD3D6772</link><guid isPermaLink="false">7A302FE9-A760-4813-A28E-2248BD3D6772-2024-06-28-18-59-52</guid><description>File #: 230186&lt;br /&gt;Ver.: 0&lt;br /&gt;Agenda #: 3.&lt;br /&gt;Type: Resolution&lt;br /&gt;Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $35,000 for a total estimated cost of these projects being $850,000.&lt;br /&gt;Action: SUBSTITUTED&lt;br /&gt;Result: Pass</description><category>Resolution</category><pubDate>Fri, 28 Jun 2024 18:59:52 GMT</pubDate></item><item><title>230186</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6266023&amp;GUID=7A302FE9-A760-4813-A28E-2248BD3D6772</link><guid isPermaLink="false">7A302FE9-A760-4813-A28E-2248BD3D6772-2024-06-28-18-59-53</guid><description>File #: 230186&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Resolution&lt;br /&gt;Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $35,000 for a total estimated cost of these projects being $850,000.&lt;br /&gt;Action: RECOMMENDED FOR  ADOPTION&lt;br /&gt;Result: Pass</description><category>Resolution</category><pubDate>Fri, 28 Jun 2024 18:59:53 GMT</pubDate></item><item><title>230187</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6266024&amp;GUID=9744DB2B-4C0A-4EB9-ADE9-17B646B6F12E</link><guid isPermaLink="false">9744DB2B-4C0A-4EB9-ADE9-17B646B6F12E-2024-06-28-18-59-52</guid><description>File #: 230187&lt;br /&gt;Ver.: 0&lt;br /&gt;Agenda #: 4.&lt;br /&gt;Type: Resolution&lt;br /&gt;Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $3,513,000 for a total estimated cost of these projects being $4,093,000.&lt;br /&gt;Action: SUBSTITUTED&lt;br /&gt;Result: Pass</description><category>Resolution</category><pubDate>Fri, 28 Jun 2024 18:59:52 GMT</pubDate></item><item><title>230187</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6266024&amp;GUID=9744DB2B-4C0A-4EB9-ADE9-17B646B6F12E</link><guid isPermaLink="false">9744DB2B-4C0A-4EB9-ADE9-17B646B6F12E-2024-06-28-18-59-53</guid><description>File #: 230187&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Resolution&lt;br /&gt;Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $3,513,000 for a total estimated cost of these projects being $4,093,000.&lt;br /&gt;Action: RECOMMENDED FOR  ADOPTION&lt;br /&gt;Result: Pass</description><category>Resolution</category><pubDate>Fri, 28 Jun 2024 18:59:53 GMT</pubDate></item><item><title>230183</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6266020&amp;GUID=2DBCB568-C1B3-4C15-B775-BAC57A439BD8</link><guid isPermaLink="false">2DBCB568-C1B3-4C15-B775-BAC57A439BD8-2024-06-28-18-59-52</guid><description>File #: 230183&lt;br /&gt;Ver.: 0&lt;br /&gt;Agenda #: 5.&lt;br /&gt;Type: Resolution&lt;br /&gt;Title: Substitute resolution directing the Commissioner of Public Works to execute project agreements titled State/Municipal Agreement for an Infrastructure Transportation Alternatives Program (TAP) Project with the Wisconsin Department of Transportation and to set up funds for design engineering at total estimated cost of $1,156,068 and an estimated City of Milwaukee share of $231,214 and a grantor share of $924,854.
Analysis
This resolution authorizes and directs the Commissioner of Public Works to execute project agreements with the Wisconsin Department of Transportation for the programming, study, design and construction of bicycle facilities with 80 percent Federal and State aid under the Transportation Alternatives Program (TAP).  This resolution also directs the City of Milwaukee Comptroller to transfer funds and establish project grant chartfield values for the preliminary engineering for these projects.  The estimated total cost of the projects is $4,930,338 of which the City’s share is $986,068 and the grantor share is $3,944,270.  The estimated preliminary engineering cost for &lt;br /&gt;Action: RECOMMENDED FOR  ADOPTION&lt;br /&gt;Result: Pass</description><category>Resolution</category><pubDate>Fri, 28 Jun 2024 18:59:52 GMT</pubDate></item><item><title>230124</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6247991&amp;GUID=C6D789A3-EE34-40DF-8ED6-663D7806DE2B</link><guid isPermaLink="false">C6D789A3-EE34-40DF-8ED6-663D7806DE2B-2024-08-15-18-50-20</guid><description>File #: 230124&lt;br /&gt;Ver.: 0&lt;br /&gt;Agenda #: 6.&lt;br /&gt;Type: Resolution&lt;br /&gt;Title: Resolution approving a Third Amendment to Lease Agreement with Verizon Wireless relating to extending the term of the lease at the Hawley Road Water Tower at 1235 North 57th Street.&lt;br /&gt;Action: HELD TO CALL OF THE CHAIR&lt;br /&gt;Result: Pass</description><category>Resolution</category><pubDate>Thu, 15 Aug 2024 18:50:20 GMT</pubDate></item><item><title>230175</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6266014&amp;GUID=1B4B77BF-8B55-4E28-95B5-41E460495DEB</link><guid isPermaLink="false">1B4B77BF-8B55-4E28-95B5-41E460495DEB-2024-07-02-15-08-55</guid><description>File #: 230175&lt;br /&gt;Ver.: 0&lt;br /&gt;Agenda #: 7.&lt;br /&gt;Type: Resolution&lt;br /&gt;Title: Resolution directing the Commissioner of Public Works to execute a document titled “2nd Revision State/Municipal Agreement for a State-Let Local Bridge Project” with the Wisconsin Department of Transportation (WisDOT) for the North Lovers Lane Road Bridge over Union Pacific Railway in Aldermanic District 5 with a total cost increase for the project of $195,965, with a Grantor share of $195,965 and a City share of $0.&lt;br /&gt;Action: RECOMMENDED FOR  ADOPTION&lt;br /&gt;Result: Pass</description><category>Resolution</category><pubDate>Tue, 02 Jul 2024 15:08:55 GMT</pubDate></item><item><title>230176</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6266015&amp;GUID=A15BD49C-CAB0-4B9B-9539-ADE891CD23D8</link><guid isPermaLink="false">A15BD49C-CAB0-4B9B-9539-ADE891CD23D8-2024-06-28-18-59-52</guid><description>File #: 230176&lt;br /&gt;Ver.: 0&lt;br /&gt;Agenda #: 8.&lt;br /&gt;Type: Resolution&lt;br /&gt;Title: Resolution directing the Commissioner of Public Works to execute a document titled “1st Revision State/Municipal Agreement for a State-Let Local Bridge Project” with the Wisconsin Department of Transportation (WisDOT) for the West Calumet Road Bridge over Little Menomonee River in Aldermanic District 5 and 9 with a total cost increase for the project of $69,024, with a Grantor share of $69,024 and a City share of $0.&lt;br /&gt;Action: RECOMMENDED FOR  ADOPTION&lt;br /&gt;Result: Pass</description><category>Resolution</category><pubDate>Fri, 28 Jun 2024 18:59:52 GMT</pubDate></item><item><title>230179</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6266017&amp;GUID=748BE207-C235-4744-982E-16160078E368</link><guid isPermaLink="false">748BE207-C235-4744-982E-16160078E368-2024-06-28-18-59-52</guid><description>File #: 230179&lt;br /&gt;Ver.: 0&lt;br /&gt;Agenda #: 9.&lt;br /&gt;Type: Resolution&lt;br /&gt;Title: Resolution directing the Commissioner of Public Works to execute a document titled “3rd Revision to State/Municipal Agreement for State-Let Highway Project” with the Wisconsin Department of Transportation for the programming, design, and construction of the West Center Street Intersection with West Lisbon Ave/North 60th Street.&lt;br /&gt;Action: RECOMMENDED FOR  ADOPTION&lt;br /&gt;Result: Pass</description><category>Resolution</category><pubDate>Fri, 28 Jun 2024 18:59:52 GMT</pubDate></item><item><title>230181</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6266019&amp;GUID=4210C6EB-25B2-4FA2-B0E4-4F99982EDB05</link><guid isPermaLink="false">4210C6EB-25B2-4FA2-B0E4-4F99982EDB05-2024-06-28-18-59-52</guid><description>File #: 230181&lt;br /&gt;Ver.: 0&lt;br /&gt;Agenda #: 10.&lt;br /&gt;Type: Resolution&lt;br /&gt;Title: Resolution directing the Commissioner of Public Works to execute a document titled “3rd Revision State/Municipal Agreement for a State-Let Highway Project” with the Wisconsin Department of Transportation for the programming, design, and construction of East Wells Street (STH 32) from North Broadway to North Van Buren Street.&lt;br /&gt;Action: RECOMMENDED FOR  ADOPTION&lt;br /&gt;Result: Pass</description><category>Resolution</category><pubDate>Fri, 28 Jun 2024 18:59:52 GMT</pubDate></item><item><title>230180</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6266018&amp;GUID=3C9A40C0-EA52-4018-BF5F-850168C9E09C</link><guid isPermaLink="false">3C9A40C0-EA52-4018-BF5F-850168C9E09C-2024-06-28-18-59-52</guid><description>File #: 230180&lt;br /&gt;Ver.: 0&lt;br /&gt;Agenda #: 11.&lt;br /&gt;Type: Resolution&lt;br /&gt;Title: Resolution directing the Commissioner of Public Works to enter into an agreement with the Wisconsin Department of Transportation for the development, implementation and funding of traffic signal timing and other improvements to mitigate traffic diversion on city streets due to construction activity on Interstate Highway 43 in 2023 and 2024, with the total cost being $25,000 of which 100% is grantor funded.&lt;br /&gt;Action: RECOMMENDED FOR  ADOPTION&lt;br /&gt;Result: Pass</description><category>Resolution</category><pubDate>Fri, 28 Jun 2024 18:59:52 GMT</pubDate></item><item><title>230198</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6248002&amp;GUID=9015D6BA-4A34-4FF1-8113-F8108B8C5673</link><guid isPermaLink="false">9015D6BA-4A34-4FF1-8113-F8108B8C5673-2024-06-28-19-30-00</guid><description>File #: 230198&lt;br /&gt;Ver.: 0&lt;br /&gt;Agenda #: 12.&lt;br /&gt;Type: Resolution&lt;br /&gt;Title: Resolution to inform the Common Council of the City’s Compliance Maintenance Annual Report for the year 2022.&lt;br /&gt;Action: HELD TO CALL OF THE CHAIR&lt;br /&gt;Result: Pass</description><category>Resolution</category><pubDate>Fri, 28 Jun 2024 19:30:00 GMT</pubDate></item><item><title>230254</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6248004&amp;GUID=00089036-77F2-43F3-869F-B1989983EA39</link><guid isPermaLink="false">00089036-77F2-43F3-869F-B1989983EA39-2024-06-28-19-30-00</guid><description>File #: 230254&lt;br /&gt;Ver.: 0&lt;br /&gt;Agenda #: 13.&lt;br /&gt;Type: Resolution&lt;br /&gt;Title: Resolution directing the Department of Public Works to develop plans for the use of the City’s “urban wood”.&lt;br /&gt;Action: HELD TO CALL OF THE CHAIR&lt;br /&gt;Result: Pass</description><category>Resolution</category><pubDate>Fri, 28 Jun 2024 19:30:00 GMT</pubDate></item><item><title>191930</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=4407690&amp;GUID=7799F967-F013-471D-B9C1-B7ECE1F786AF</link><guid isPermaLink="false">7799F967-F013-471D-B9C1-B7ECE1F786AF-2025-04-30-16-37-28</guid><description>File #: 191930&lt;br /&gt;Ver.: 0&lt;br /&gt;Agenda #: 14.&lt;br /&gt;Type: Communication&lt;br /&gt;Title: Communication from the Department of Public Works relating to the status of current and future operations.&lt;br /&gt;Action: HELD TO CALL OF THE CHAIR&lt;br /&gt;Result: Pass</description><category>Communication</category><pubDate>Wed, 30 Apr 2025 16:37:28 GMT</pubDate></item><item><title>211119</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=5206620&amp;GUID=CD051519-9324-4F1A-B3B3-36881FBC401F</link><guid isPermaLink="false">CD051519-9324-4F1A-B3B3-36881FBC401F-2025-04-25-21-07-34</guid><description>File #: 211119&lt;br /&gt;Ver.: 0&lt;br /&gt;Agenda #: 15.&lt;br /&gt;Type: Communication&lt;br /&gt;Title: Communication from the Department of Public Works relating to the status of Traffic-Calming and Complete Streets projects to address reckless driving and to provide a safer infrastructure for bicyclists and pedestrians.&lt;br /&gt;Action: HELD TO CALL OF THE CHAIR&lt;br /&gt;Result: Pass</description><category>Communication</category><pubDate>Fri, 25 Apr 2025 21:07:34 GMT</pubDate></item><item><title>230245</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6248003&amp;GUID=FD64FED8-AC55-45BB-AA82-663F7881DF1A</link><guid isPermaLink="false">FD64FED8-AC55-45BB-AA82-663F7881DF1A-2023-06-13-13-54-33</guid><description>File #: 230245&lt;br /&gt;Ver.: 0&lt;br /&gt;Agenda #: 16.&lt;br /&gt;Type: Communication&lt;br /&gt;Title: Communication from the Department of Public Works relating to the safety of E. Brady St.&lt;br /&gt;Action: HELD TO CALL OF THE CHAIR&lt;br /&gt;Result: Pass</description><category>Communication</category><pubDate>Tue, 13 Jun 2023 13:54:33 GMT</pubDate></item><item><title>230263</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6248005&amp;GUID=46EC189E-605C-4839-A2E3-DB37B9231D33</link><guid isPermaLink="false">46EC189E-605C-4839-A2E3-DB37B9231D33-2023-06-08-21-44-24</guid><description>File #: 230263&lt;br /&gt;Ver.: 0&lt;br /&gt;Agenda #: 17.&lt;br /&gt;Type: Communication&lt;br /&gt;Title: Communication from the Department of Public Works relating to the management, operation, and future of the Multi-Use Recycling Facility.&lt;br /&gt;Action: HELD TO CALL OF THE CHAIR&lt;br /&gt;Result: Pass</description><category>Communication</category><pubDate>Thu, 08 Jun 2023 21:44:24 GMT</pubDate></item><item><title>221855</title><link>https://milwaukee.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6102519&amp;GUID=435BAB13-6C0F-4B97-BF5B-7F4BFE681693</link><guid isPermaLink="false">435BAB13-6C0F-4B97-BF5B-7F4BFE681693-2024-06-28-18-59-52</guid><description>File #: 221855&lt;br /&gt;Ver.: 0&lt;br /&gt;Agenda #: 18.&lt;br /&gt;Type: Motion&lt;br /&gt;Title: Motion relating to the recommendations of the Public Works Committee relating to licenses.&lt;br /&gt;Action: RECOMMENDED FOR  APPROVAL&lt;br /&gt;Result: Pass</description><category>Motion</category><pubDate>Fri, 28 Jun 2024 18:59:52 GMT</pubDate></item></channel></rss>