File #: 090763    Version:
Type: Resolution Status: Passed
File created: 10/13/2009 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 11/3/2009
Effective date:    
Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $3,826,817 for a total estimated cost of these projects being $4,181,837.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Fiscal Note, 2. Cover Letter, 3. Comptroller certification, 4. Hearing Notice List
Number
090763
Version
SUBSTITUTE 1
Reference
060882
Sponsor
THE CHAIR
Title
Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $3,826,817 for a total estimated cost of these projects being $4,181,837.
Analysis
This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works. The City cost of the projects approved by this resolution is estimated to be $3,826,817. The total estimated cost of these projects is $4,181,837.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and

Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:

1st Aldermanic District

W. Hampton Av. - Bridge over Lincoln Creek (N. 31st St. to N. 32nd St.) (BR320062101/ST320062101)(2545-12-70) File Number 060882: Replace bridge, asphalt pavement resurfacing of bridge approaches, replace curb and gutter, sidewalk as necessary and grading.
Grantor Non-Reimbursable Paving Fund--$ 88,071
Grantor Reimbursable Paving Fund -- $12,900
City Share Non-assessable Paving Fund--$ 26,535

Grantor Non-Reimbursable Structure Fund--$ 1,007,865
Grantor Structure Reimbursable Structure Fund--$153,300
City Share Non-Assessable Structure Fund--$ 305,146

These funds are to be transferred to the construction account (BR320062110/ST320062110) (2545-12-70).

Previously authorized for bridge construction: $0.00
Current estimated cost of the total project including this resolution: $1,840,837
Original estimated cost of the total project (File Number 060882): $ 1,497,000
This project is anticipated to be completed during the 2010 construction season.

3rd Aldermanic District

N...

Click here for full text