Number
090592
Version
SUBSTITUTE 3
Reference
Sponsor
THE CHAIR
Title
A substitute ordinance implementing various provisions of the 2010 budget.
Sections
79-1-12-c am
79-2-8 am
79-4-1-am-1 am
79-6.5-3-b am
79-6.5-3-c-1 am
79-14.5 rc
81-22-6 rp
81-23-6 rp
81-26-6 rp
81-30.5-5 rp
81-35.9 cr
81-85 rc
81-114.6-1 am
310-1-10 cr
310-5 cr
320-49-5 rc
350-100 am
350-183-8 am
Analysis
This ordinance makes various changes in the city code for the implementation of the 2010 city budget. Specifically, the ordinance:
1. Expands the current definition of construction waste to include roofing material, asphalt, brick, stones, concrete, lumber, drywall, paneling and other construction material.
2. Provides that bulky waste not exceeding 2 cubic feet shall be collected by the department of public works between April 1 and November 30. Currently, bulky waste not exceeding 4 cubic feet is collected by the department.
3. Establishes construction debris charges for depositing or dropping commercial, construction or manufacturing or similar waste at city area sanitation yards. The charges range from $10 to $20 based on the types of vehicles used for transporting the debris.
4. Doubles the special event fee for a Class A Event from $1,850 to $3,700.
5. Adjusts the fee for duplicate copies of certain alcohol beverage licenses to make them consistent with the amount charged for duplicates of other licenses. The fee will be $10.
6. Increases permit fees for on-street all night parking ($20 for a 4-month permit, $55 for an annual permit if the permit is purchased in the first 4 months of the year, and $40 if the permit is purchased in the second 4 months of the year).
7. Provides that the director of environmental sustainability be appointed by the director of administration and confirmed by the common council.
8. Assigns staffing responsibility for the capital improvements committee to the city clerkâs office.
9. Freezes salaries for the mayor, common members and ...
Click here for full text