File #: 080389    Version:
Type: Resolution Status: Passed
File created: 7/1/2008 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 7/30/2008
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,580,000 for a total estimated cost of $1,734,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Infrastructure Services Division Cover Letter, 2. 7/29/08 Revised Committee Actions on Street Assessments, 3. 7/16/08 Committee Actions on Street Assessments, 4. OFFICIAL NOTICE NUMBER 12, 5. Hearing notice list, 6. Sub. 1 Fiscal Note, 7. Sub. 2 Fiscal note, 8. Proposed Sub.pdf, 9. Proposed Sub. A Fiscal note, 10. Notice Published on 8-15-08
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
8/15/20082 CITY CLERK PUBLISHED   Action details Meeting details Not available
8/6/20082 MAYOR SIGNED   Action details Meeting details Not available
7/30/20082 COMMON COUNCIL ADOPTEDPass12:0 Action details Meeting details Not available
7/29/20082 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: As amended.
Pass5:0 Action details Meeting details Not available
7/29/20081 PUBLIC WORKS COMMITTEE AMENDED

Minutes note: The following projects were reconsidered and approved: 5th Aldermanic District W. Lorraine Pl. – N. 95th St. to N. 97th St. (ST211080119): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding, and grading. Ald. Puente moved to reconsidered. Prevailed. Approve with late billing, by Ald. Puente. Prevailed. 11th Aldermanic District W. Eden Pl. – S. Sunset Dr. to S. Massachusetts Dr. (ST211020113): Asphalt pavement resurfacing, sodding and grading. Ald. Dudzik moved to reconsidered. Prevailed. Approve with late billing, by Ald. Dudzik. Prevailed. S. 75th St. – W. Howard Ave. to S. Massachusetts Dr. (ST211080102): Asphalt pavement resurfacing, sodding, and grading. Ald. Dudzik moved to reconsidered. Approve with late billing, by Ald. Dudzik. Prevailed. 15th Aldermanic District N. 34th St. – W. Brown St. to W. North Ave. (ST211070156): Asphalt pavement resurfacing, replace all curb and gutter, sidewalk and driveway approaches, sodding, grading, and tree removal where necessary. Appearance by Mr. Alex Runner – Aide to A.D. 15 Ald. Donovan moved to reconsidered. Prevailed. Approve with late billing, by Ald. Donovan. Prevailed. Alley between W. Brown St., W. Fond du Lac Ave., N. 14th St. and N. 15th St. (ST212080113): Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. Appearance by Mr. Alex Runner – Aide to A.D. 15 Ald. Wade moved to reconsidered. Prevailed. Approve with late billing, by Ald. Wade. Prevailed. Ald. Wade moved to amend by including the above approved projects.
Pass5:0 Action details Meeting details Not available
7/29/20081 PUBLIC WORKS COMMITTEE RECONSIDEREDPass5:0 Action details Meeting details Not available
7/16/20080 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass5:0 Action details Meeting details Not available
7/16/20080 PUBLIC WORKS COMMITTEE SUBSTITUTEDPass5:0 Action details Meeting details Not available
7/9/20080 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
7/1/20080 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
080389
Version
SUBSTITUTE 2
Reference
071168
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,580,000 for a total estimated cost of $1,734,000.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $1,580,000. The total estimated cost of these projects is $1,734,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

2nd Aldermanic District

W. Fiebrantz Ave. - W. Appleton Ave. to N. 76th St. (ST211080120) File Number 071168: Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding, grading, and tree removal where necessary. (Assessable Reconstruction Paving Fund -- $25,000; Nonassessable Reconstruction Paving Fund -- $75,000). The total estimated cost for this project including the requested amount is $107,000. This project is anticipated to be completed during the 2008 construction season.

5th Aldermanic District

W. Lorraine Pl. - N. 95th St. to N. 94th St. (ST211080119) File Number 070782: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding, and grading. (Assessable Reconstruction Paving Fund -- $51,000.00; Nonassessable Reconstruction Paving Fund -- $100,000.00). The t...